Video walkthrough: Creating and Managing Bills of Materials (BOMs) in Sutton
Watch this video to see how to create a BOM, add materials and quantities, and manage BOM versions.
Where to find BOMs & how to create one
Go to Items and open the item.
Click the Production tab.
At the top of the tab, three summary cards show Qty produced, Qty expected from production, and Avg production cost / pcs for this item. Below them, Production items has three tabs: BOM, Routing, and Production history. Your BOM versions are on the BOM tab.
Step 1: Create a BOM version
Sutton creates BOM Version 1. Because it’s the item’s only BOM, it’s tagged Default BOM. The new version is empty until you add materials.
Step 2: Add materials and quantities
On the BOM version, click Edit BOM.
In the Edit BOM window, click Add or remove items.
In the Select items window, search for each material you need and select its checkbox. You can also click the camera icon to scan a barcode.
Click Add items. The materials are added to the Edit BOM window.
Enter the Quantity of each material needed to make the item.
Click Save.
As you enter quantities, the Edit BOM window shows each material’s Unit, Unit cost, and Static cost (unit cost × quantity), with the total cost at the bottom. You can also add Notes to any material line.
Quantities are per one unit of the finished item. For example, if a chocolate bar needs 2.6 kg of chocolate base, a manufacturing order for 50 bars plans 130 kg.
💡 Pro tip: If a material doesn’t exist yet, click Create new item in the Select items window to create it without leaving the BOM. To remove a material later, open Add or remove items again and clear its checkbox.
Reading the BOM table
After you save, the BOM version shows a table with every material. Scroll right to see all the columns.
Column | What it shows |
Items | The material’s name. Subassemblies show an arrow and the number of materials they use. |
SKU | The material’s SKU, if it has one. |
Level | Assembly for a material that’s made from other materials. Component for a material that isn’t made from other materials. |
Type | Whether your organization makes the material (Make) or buys it from a vendor (Buy). Some materials are both. |
Quantity | How much of the material you need to make one unit of the item. |
Unit | The material’s unit of measure. |
Gross weight per UoM | The weight of one unit of the material, set on the material’s Details tab. |
Static weight | The weight of this line only: gross weight per UoM × quantity. |
Rollup weight | The weight of this line, including the materials inside any subassembly. |
Unit cost | The cost of one unit of the material. Blank for subassemblies. |
Static cost | Unit cost × quantity for this material line. Blank for subassemblies. |
Rollup cost | For a material, the same as static cost. For a subassembly, its quantity × the combined rollup cost of the materials it’s made from. The total at the bottom is the full cost to make one unit of the item. |
Notes | Any notes added to the material line in the Edit BOM window. |
Viewing subassemblies
Some materials are subassemblies: materials made from other materials, shown as Assembly in the Level column. Click the arrow next to a subassembly to see the materials it’s made from, and click it again to close it.
To open or close every subassembly at once, click the double arrow next to Items.
To sort the table, click a column header. Click it again to switch between ascending and descending order.
📘 Sutton tip: For help structuring nested BOMs, see How do I handle multi-level assemblies and subassemblies?
Managing BOM versions
Use BOM versions to keep multiple recipes for the same item, for example, a seasonal formula or a material substitute.
Add another BOM version
The quickest way to add a version is to copy one you already have. Click the three-dot menu next to Edit BOM and select Duplicate.
The copy has the same materials and quantities as the original and is named Copy of followed by the original name.
Further copies are numbered, for example, Copy (2) of BOM Version 1. Click Edit BOM on the copy to change its materials or quantities.
To start from an empty version instead, click Create new BOM version and add materials as in Step 2.
✅ Best practice: To test a recipe change, duplicate the current default, edit the copy, and make it the default only when it’s ready. Your current BOM stays untouched until then.
Rename a BOM version
Click the pencil icon next to the BOM name, type the new name, and save it.
Each BOM version name must be unique for that item, so rename copies to keep versions easy to tell apart.
Set a different default
Once an item has more than one version, one is tagged Default BOM and appears at the top of the list. To change it, click the three-dot menu on a version that isn’t the default and select Make default.
The Default BOM tag moves to that version, and it moves to the top of the list.
Delete a BOM version
Click the three-dot menu, select Delete, then click Delete BOM to confirm.
You can’t delete a BOM version that’s linked to manufacturing orders or price breaks. Instead, a This BOM can’t be deleted window lists the linked manufacturing orders. Click Manage manufacturing orders to review them.
⚠️ Heads up: Deleting a BOM version can’t be undone. If you might need it again, duplicate it first. To stop using a version, make another version the default instead of deleting it.
Changing the BOM for one manufacturing order
To use different materials or quantities for a single job without changing the item’s BOM versions, use Modify BOM on the manufacturing order. See Modifying the BOM for a Single Manufacturing Order.
Viewing every BOM in the All BOMs report
The report lists every BOM in your organization, with one row for each material in each BOM. It shows the Item, its SKU, the BOM name, a checkmark in Default for default versions, the BOM item and its BOM item SKU, the Quantity, Unit and any Instructions. Use the search box to find an item, or click the download icon to export the report.
Your BOMs are ready to use
With your materials and quantities in place and a default version set, Sutton knows what each item needs to be made. Your team can now plan manufacturing orders with the right materials and see what each unit costs to produce.
FAQ
Can I delete a BOM version?
Can I delete a BOM version?
Yes, as long as it isn’t linked to manufacturing orders or price breaks. Click the three-dot menu on the version, select Delete, and confirm. This can’t be undone, so duplicate the version first if you might need it again.
Can an item have more than one BOM?
Can an item have more than one BOM?
Yes. Click Create new BOM version or duplicate an existing version. One version is always the default, and you can change which one with Make default.
Which BOM version does a new manufacturing order use?
Which BOM version does a new manufacturing order use?
The default version, unless you choose another one. You can change it in the BOM version field while you create the order. Once you save the order, its BOM version is locked. To change materials for that order after saving, use Modify BOM.
Can I change the BOM for just one manufacturing order?
Can I change the BOM for just one manufacturing order?
Yes. Use Modify BOM on the manufacturing order. Your changes apply only to that order. See Modifying the BOM for a Single Manufacturing Order.
Can a BOM include an item that has its own BOM?
Can a BOM include an item that has its own BOM?
Yes. A material made from other materials is a subassembly, shown as Assembly in the Level column. Click its arrow to see the materials it’s made from.
If you have additional questions, please reach out to your Customer Success Manager or contact us at [email protected].